VK6RTH – Tic Hill – Site Working Bee – Wed 11th July

A successful working bee at Tic Hill was carried out on 11th July.

Work carried out consisted of:

APRS antenna stand-off replacement (to keep antenna vertical)

INOX placed in batteries and placed on high charge (via 2KW petrol Generator)

Reconnection of all 6x Solar panels (total 350W) with each pair isolated

Current measurement of all/individual equipment at site (Standby, power-up and TX)

WAFN antennas/cabling/equipment replacement/tidy up and new solar pannel/batteries installed (not independant power system)

Thanks to 6POP, 6JAH, 6TWO,6ZRW, 6FLEX,WAFN

Loading